Main Reference PaperDCIM: Distributed Cache Invalidation Method for Maintaining Cache Consistency in Wireless Mobile Networks, IEEE Transactions on Mobile Computing, April 2013.
  • Distributed cache invalidation mechanism (DCIM), a Pull-Based Algorithm ensures the cache consistency through the implementation of techniques such as adaptive Time to Live (TTL) based on the update rate, piggybacking, and prefetching high request rate items.

+ Description
  • Distributed cache invalidation mechanism (DCIM), a Pull-Based Algorithm ensures the cache consistency through the implementation of techniques such as adaptive Time to Live (TTL) based on the update rate, piggybacking, and prefetching high request rate items.

  • The goal of DCIM is to improve the efficiency of the cache update process

  • To reduce the traffic and query delay in MANET by using the piggybacking and prefetching techniques

  • To achieve the Cache Consistency by employing an adaptive TTL

+ Aim & Objectives
  • The goal of DCIM is to improve the efficiency of the cache update process

  • To reduce the traffic and query delay in MANET by using the piggybacking and prefetching techniques

  • To achieve the Cache Consistency by employing an adaptive TTL

  • Hybrid algorithm that combines both Push and Pull Based Algorithm is contributed. Registered users are updated by server itself without the use of request from client

+ Contribution
  • Hybrid algorithm that combines both Push and Pull Based Algorithm is contributed. Registered users are updated by server itself without the use of request from client

  • OS : Window 7 (Cygwin) / Ubuntu 12.04 LTS 64bit.

  • Simulator: NS 2.35, Language : TCL and AWK script, (C++)

+ Software Tools & Technologies
  • OS : Window 7 (Cygwin) / Ubuntu 12.04 LTS 64bit.

  • Simulator: NS 2.35, Language : TCL and AWK script, (C++)

  • B.E / B.Tech / M.E / M.Tech

+ Project Recommended For
  • B.E / B.Tech / M.E / M.Tech

Professional Ethics: We S-Logix would appreciate the students those who willingly contribute with atleast a line of thinking of their own while preparing the project with us. It is advised that the project given by us be considered only as a model project and be applied with confidence to contribute your own ideas through our expert guidance and enrich your knowledge.