Main Reference PaperCoverage Differentiation Based Adaptive Tx-Power for Congestion and Awareness Control in VANETs, Mobile Network Application, 2016 [NS2]
  • A Multi-metric Power Control (MPC) approach is proposed, which uses application requirements and channel states to determine a transmit power for safety messages. The MPC gives a best-effort approach to satisfy the coverage range requirement of a message as specified by the application. Moreover, the concept distinguishes among message types to provide coverage differentiation

Description
  • A Multi-metric Power Control (MPC) approach is proposed, which uses application requirements and channel states to determine a transmit power for safety messages. The MPC gives a best-effort approach to satisfy the coverage range requirement of a message as specified by the application. Moreover, the concept distinguishes among message types to provide coverage differentiation

  • To enhance reliability for event driven messages by using prioritized channel access

  • To maximize the coverage of event-driven messages in the context

  • To enhance the reliability and reduce the collision

Aim & Objectives
  • To enhance reliability for event driven messages by using prioritized channel access

  • To maximize the coverage of event-driven messages in the context

  • To enhance the reliability and reduce the collision

  • A technique is contributed to further improve the reliability and avoid the congestion in the network.

Contribution
  • A technique is contributed to further improve the reliability and avoid the congestion in the network.

  • Operating System : Ubuntu 12.04 LTS 64bit.

  • Simulator: NS 2.35, Language : TCL and AWK script, (C++)

Software Tools & Technologies
  • Operating System : Ubuntu 12.04 LTS 64bit.

  • Simulator: NS 2.35, Language : TCL and AWK script, (C++)

  • M.E / M.Tech / MS / Ph.D.- Customized according to the client requirements.

Project Recommended For
  • M.E / M.Tech / MS / Ph.D.- Customized according to the client requirements.

  • No Readymade Projects-project delivery Depending on the complexity of the project and requirements.

Order To Delivery
  • No Readymade Projects-project delivery Depending on the complexity of the project and requirements.

Professional Ethics: We S-Logix would appreciate the students those who willingly contribute with atleast a line of thinking of their own while preparing the project with us. It is advised that the project given by us be considered only as a model project and be applied with confidence to contribute your own ideas through our expert guidance and enrich your knowledge.

Leave Comment

Your email address will not be published. Required fields are marked *

clear formSubmit