Main Reference PaperDelay Analysis of ML-MAC Algorithm For Wireless Sensor Networks, International Journal of Computer Applications, June 2014.
  • This paper is proposed to analyze the performance of ML-MAC algorithm with S-MAC by considering the delay and energy consumption. The simulation result of ML-MAC algorithm is better than the S-MAC algorithm, because sensors in ML-MAC algorithmhave very short listening time than S-MAC and also conserving energy by low duty cycle.

Description
  • This paper is proposed to analyze the performance of ML-MAC algorithm with S-MAC by considering the delay and energy consumption. The simulation result of ML-MAC algorithm is better than the S-MAC algorithm, because sensors in ML-MAC algorithmhave very short listening time than S-MAC and also conserving energy by low duty cycle.

  • To minimize the probability of collision.

  • To compare the performance of energy consumption and delay both MAC algorithm.

  • To find the energy efficiency mac protocol.

Aim & Objectives
  • To minimize the probability of collision.

  • To compare the performance of energy consumption and delay both MAC algorithm.

  • To find the energy efficiency mac protocol.

  • Along with the ML-MAC, further extend the MAC algorithm method for analyzing the energy consumption under varying traffic load and also with the specified parameters.

Contribution
  • Along with the ML-MAC, further extend the MAC algorithm method for analyzing the energy consumption under varying traffic load and also with the specified parameters.

  • OS : Window 7 (Cygwin) / Ubuntu 12.04 LTS 64bit.

  • Simulator: NS 2.35, Language : TCL and AWK script, (C++)

Software Tools & Technologies
  • OS : Window 7 (Cygwin) / Ubuntu 12.04 LTS 64bit.

  • Simulator: NS 2.35, Language : TCL and AWK script, (C++)

  • M.E / M.Tech / MS / Ph.D.- Customized according to the client requirements.

Project Recommended For
  • M.E / M.Tech / MS / Ph.D.- Customized according to the client requirements.

  • No Readymade Projects-Depending on the complexity of the project and requirements.

Order To Delivery
  • No Readymade Projects-Depending on the complexity of the project and requirements.

Professional Ethics: We S-Logix would appreciate the students those who willingly contribute with atleast a line of thinking of their own while preparing the project with us. It is advised that the project given by us be considered only as a model project and be applied with confidence to contribute your own ideas through our expert guidance and enrich your knowledge.