Main Reference PaperJoint Route Selection and Update Scheduling for Low-Latency Update in SDNs, IEEE/ACM Transactions on Networking, July 2017 [NS2]
  • The proposed work designs a new route configuration for managing the workload. This work solves the issues in real-time route update by jointly considering the optimization of flow route selection in the control plane and update scheduling in the data plane. Moreover, this work formulates the delay-satisfied route update problem to prove its NP-hardness.

+ Description
  • The proposed work designs a new route configuration for managing the workload. This work solves the issues in real-time route update by jointly considering the optimization of flow route selection in the control plane and update scheduling in the data plane. Moreover, this work formulates the delay-satisfied route update problem to prove its NP-hardness.

  • To solve problem in low latency update in SDN using joint route selection and update scheduling.

  • To solve definition of delay-satisfied route update issue using rounding-based route update algorithm

+ Aim & Objectives
  • To solve problem in low latency update in SDN using joint route selection and update scheduling.

  • To solve definition of delay-satisfied route update issue using rounding-based route update algorithm

  • A technique is contributed to speed up the network update by considering multiple features.

+ Contribution
  • A technique is contributed to speed up the network update by considering multiple features.

  • Operating System : Ubuntu 12.04 LTS 64bit

  • Simulator: NS 2.35, Language : TCL and AWK Script, (C++)

+ Software Tools & Technologies
  • Operating System : Ubuntu 12.04 LTS 64bit

  • Simulator: NS 2.35, Language : TCL and AWK Script, (C++)

  • B.E / B.Tech / M.E / M.Tech

+ Project Recommended For
  • B.E / B.Tech / M.E / M.Tech

Professional Ethics: We S-Logix would appreciate the students those who willingly contribute with atleast a line of thinking of their own while preparing the project with us. It is advised that the project given by us be considered only as a model project and be applied with confidence to contribute your own ideas through our expert guidance and enrich your knowledge.